In the first time we have spoken about PLC History and Future. Today we will speak about the Programmable logic Controller (PLC) itself.
A programmable controller, as illustrated in below Figure , consists of two basic sections:
• the central processing unit
• the input/output interface system
• the central processing unit
• the input/output interface system
The central processing unit (CPU) governs all PLC activities. The following three components, shown in below Figure, form the CPU:
• the processor
• the memory system
• the system power supply
• the processor
• the memory system
• the system power supply
The operation of a programmable controller is relatively simple. The input/ output (I/O) system is physically connected to the field devices that are encountered in the machine or that are used in the control of a process. These field devices may be discrete or analog input/output devices, such as limit switches, pressure transducers, push buttons, motor starters, solenoids, etc.
The I/O interfaces provide the connection between the CPU and the information providers (inputs) and controllable devices (outputs). During its operation, the CPU completes three processes:
(1) it reads, or accepts, the input data from the field devices via the input interfaces
(2) it executes, or performs, the control program stored in the memory system
(3) it writes, or updates, the output devices via the output interfaces.
This process of sequentially reading the inputs, executing the program in memory, and updating the outputs is known as scanning.Below Figure illustrates a graphic representation of a scan.
The input/output system forms the interface by which field devices are connected to the controller (see below Figure ).
The main purpose of the interface is to condition the various signals received from or sent to external field devices. Incoming signals from sensors (e.g., push buttons, limit switches, analog sensors, selector switches, and thumb-wheel switches) are wired to terminals on the input interfaces. Devices that will be controlled, like motor starters, solenoid valves, pilot lights, and position valves, are connected to the terminals of the output interfaces. The system power supply provides all the voltages required for the proper operation of the various central processing unit sections.
Although not generally considered a part of the controller, the programming device, usually a personal computer or a manufacturer's mini programmer unit, is required to enter the control program into memory.
The programming device must be connected to the controller when entering or monitoring the control program.
The programming device must be connected to the controller when entering or monitoring the control program.
Labels:
هندسة القوى والألات الكهربية
الاشتراك في:
تعليقات الرسالة (Atom)
5 comments:
thank you
Impressed with the way the PLC was explained….. Indeed it was a gift from God almighty to the control engineer because in my days for medium size control system, the control engineer or the instrumentation engineer has to deal with lots and lots of relays of all sorts of shapes , sizes , function and different voltages( 220,110 24,12,6….. DC and the same nightmare in DC ) then converters and so on……..and the real …real nightmare is when a fault hits the system….. but when the PLC came along the control engineer can enjoy a cup of tea in peace cause he knows things are going to be all right Well don very useful stuff or should I say ………..cool stuff…man
شركة عزل اسطح بالرياض
عزل اسطح
عزل اسطح بالرياض
شركة عزل اسطح
افضل شركة عزل اسطح بالرياض
شركات عزل اسطح بالرياض
اسعار شركات عزل اسطح بالرياض
ارقام شركة عزل اسطح بالرياض
عزل الاسطح فوق البلاط
عزل سطح شينكو
عزل اسطح مستودعات
شركة عزل أسطح شمال الرياض
شركة عزل أسطح شرق الرياض
شركة نقل عفش من الرياض الى الكويت
شركة نقل عفش من الرياض الى القصيم
شركة نقل عفش من الرياض الى البحرين
شركة نقل عفش من الرياض الى الدمام الاحساء الخبر
شركة نقل عفش من الرياض الى المدينة المنورة
Thanks for your wonderful post! I definitely enjoyed reading it. You could be a fantastic author. I'll remember to bookmark your blog and come back in the future. I encourage you to continue your great work. Have a nice morning! For Botswana Business eVisa application, ensure your passport validity of 6 months, a business invitation letter, flight details, accommodation proof, and application form. Processing takes around 5 working days.
إرسال تعليق
ضع تعليقك أو أستفسارك